Mathematics Standard • Year 12 • Module 6 • Lesson 8
Multiple Critical Paths, Skill Drill
Build fluency in finding ALL critical paths in a network, spotting shared activities, and planning efficient crashing when more than one path is critical.
1. Quick recall
Answer each question in the space provided. 1 mark each
Q1.1 A network has paths of length 11, 11 and 9 days. The project duration is ____ days, and ____ paths are critical.
Q1.2 An activity that lies on more than one critical path is called a ____________ activity.
Q1.3 To reduce the project duration when there are two critical paths sharing no activities, you must crash at least one activity on ____________ path.
2. Worked example, finding all critical paths
Follow each line of working. Every step has a reason on the right.
Problem. A network has: A(3,−), B(4,A), C(2,A), D(3,B), E(5,C), F(2,D,E). Find ALL critical paths.
Step 1, Forward scan (ES and EF).
A: ES=0, EF=3. B: ES=3, EF=7. C: ES=3, EF=5. D: ES=7, EF=10. E: ES=5, EF=10. F: ES=max(10,10)=10, EF=12.
Reason: at burst points, ES = max(EF of predecessors).
Step 2, List every path and its length.
Path 1: A → B → D → F = 3 + 4 + 3 + 2 = 12.
Path 2: A → C → E → F = 3 + 2 + 5 + 2 = 12.
Reason: project duration is the longest path. Any path equal to that length is critical.
Step 3, Identify shared activities.
Both paths contain A (at the start) and F (at the end). B, D are unique to Path 1; C, E are unique to Path 2.
Step 4, State the answer clearly.
Project duration = 12 days. Critical paths: A → B → D → F and A → C → E → F. Shared critical activities: A, F.
3. Faded example, fill in the missing steps
Network: A(2,−), B(3,A), C(2,A), D(4,B), E(5,C), F(1,D,E). Fill in each blank line. 4 marks
Step 1, Forward scan:
A: ES=0, EF=____. B: ES=____, EF=____. C: ES=____, EF=____. D: ES=____, EF=____. E: ES=____, EF=____. F: ES=max(____,____)=____, EF=____.
Step 2, Length of each path:
Path A-B-D-F = 2 + ____ + ____ + ____ = ____.
Path A-C-E-F = 2 + ____ + ____ + ____ = ____.
Step 3, Critical paths:
Project duration = ____ days. Critical path(s) = ________________.
Step 4, Shared activities: ____________ (list those on every critical path).
4. Graduated practice, Multiple critical path skills
Show working: list each path and its length, then state which are critical.
Foundation, read off given path lengths (4 questions)
| Q | Problem | Answer |
|---|---|---|
| 4.1 1 | Path lengths: 10, 8, 7. Which path(s) are critical and what is the project duration? | |
| 4.2 1 | Path lengths: 14, 14, 13. How many critical paths? | |
| 4.3 1 | Path lengths: 20, 20, 20. How many critical paths? | |
| 4.4 1 | True or False: A near-critical path has float greater than zero but small. |
Standard, find critical paths from a small network (6 questions)
Show working: list every path and its length, then identify the critical set.
4.5 A(2,−), B(3,A), C(4,A), D(2,B), E(1,C), F(3,D,E). Find all critical path(s). 2 marks
4.6 A(3,−), B(2,A), C(2,A), D(4,B), E(4,C), F(1,D,E). Find critical path(s) and shared activities. 2 marks
4.7 A(4,−), B(3,A), C(3,A), D(5,B), E(5,C), F(2,D,E). What is the project duration and how many critical paths are there? 2 marks
4.8 Project has two critical paths: A → B → D → F and A → C → E → F (each 12 days). Activity B can be crashed by 1 day. Will the project duration shorten? Explain in one sentence. 2 marks
4.9 Same project as 4.8. If activity A (shared) is crashed by 1 day, what is the new project duration? 2 marks
4.10 A project's critical path is 18 days. A near-critical path is 17 days. If a delay adds 1 day to the critical path, what now happens? 2 marks
Extension, crash strategy with multiple paths (2 questions)
4.11 A project has THREE critical paths sharing no common activities. You need to cut 1 day. Explain the minimum number of activity-crashes needed and why. 3 marks
4.12 A project has critical paths X (A → B → D → F) and Y (A → C → E → F). Crashing A costs $300/day; B costs $200/day; C costs $400/day. Cut the duration by 1 day at minimum cost. Show your choice and the cost. 3 marks
5. Self-check the easy 3
Tick the first three once you've checked your method works.
How did this worksheet feel?
What I'll revisit before next class:
Q1.1, Two paths of equal max length
Project duration = 11 days. 2 paths are critical.
Q1.2, Shared activity
A shared critical activity.
Q1.3, Crashing two disjoint critical paths
You must crash at least one activity on each (every) critical path.
Q3, Faded example
Step 1: A(0,2), B(2,5), C(2,4), D(5,9), E(4,9), F(9,10).
Step 2: A-B-D-F = 2 + 3 + 4 + 1 = 10. A-C-E-F = 2 + 2 + 5 + 1 = 10.
Step 3: Project duration = 10 days. Critical paths: A → B → D → F and A → C → E → F.
Step 4: Shared = A and F.
Q4.1, Path lengths 10, 8, 7
Project duration = 10 days. Only the 10-day path is critical.
Q4.2, Path lengths 14, 14, 13
2 critical paths (both 14-day paths). The 13-day path has 1-day float.
Q4.3, Path lengths 20, 20, 20
3 critical paths all share the same maximum length.
Q4.4, Near-critical definition
True near-critical paths have small but positive float; they are not currently critical but could become so if the critical path is delayed.
Q4.5, Network A,B,C,D,E,F
Forward: A(0,2), B(2,5), C(2,6), D(5,7), E(6,7), F(7,10). Paths: A-B-D-F = 2+3+2+3 = 10. A-C-E-F = 2+4+1+3 = 10. Both critical (10 days). Shared: A, F.
Q4.6, Network A,B,C,D,E,F (alt)
A(0,3), B(3,5), C(3,5), D(5,9), E(5,9), F(9,10). Paths: A-B-D-F = 3+2+4+1 = 10. A-C-E-F = 3+2+4+1 = 10. Both critical (10 days). Shared: A and F.
Q4.7, Symmetric network
A(0,4), B(4,7), C(4,7), D(7,12), E(7,12), F(12,14). Paths: A-B-D-F = 4+3+5+2 = 14. A-C-E-F = 4+3+5+2 = 14. Project duration = 14 days. 2 critical paths.
Q4.8, Crashing only one path
No. Crashing B shortens A-B-D-F to 11 days, but A-C-E-F is unchanged at 12. Project duration stays at 12 (controlled by the unshortened critical path).
Q4.9, Crashing a shared activity
A is on BOTH critical paths. Crashing A by 1 day shortens both: A-B-D-F = 11, A-C-E-F = 11. New duration = 11 days. Shared-activity crashes give double value.
Q4.10, Near-critical promotion
Critical becomes 19 days; near-critical (still 17 + 0 = 17? but if the delay is on critical, near-critical is still 17). Actually: critical now 19, near-critical still 17, gap is 2, so near-critical is no longer "near". Corrected: If the delay applies generally, both paths slip by 1, critical is 19 and near-critical is 18. Difference shrinks but near-critical still NOT critical. If the delay applies only to the critical, near-critical stays 17 and the gap grows.
Q4.11, Three disjoint critical paths, cut 1 day
You must crash one activity on each of the three paths = minimum 3 crashes. Reason: with no shared activities, each path is reduced independently. Shortening only one or two leaves the others at the original duration, so the project duration is unchanged.
Q4.12, Choose cheapest 1-day cut
Option 1, crash A (shared) by 1 day = $300, both paths drop by 1 ⇒ new duration = original − 1.
Option 2, crash B (Path X only) by 1 day = $200, but Path Y unchanged ⇒ project unchanged.
Option 3, crash B + C (one per path) = $200 + $400 = $600, both paths drop ⇒ new duration = original − 1.
Cheapest = $300 (crash A by 1 day). Insight: a shared-activity crash beats two separate crashes whenever cost(shared) < sum of separates.